chippyo
re-caulk shower quartz bathroom walls
Photo 1
Photo 2
Photo 3
Photo 4
7 more

Is $275 to re-caulk shower quartz bathroom walls a fair price?

Project Details

I had a bathroom re-caulking job done on shower quartz bathroom walls. I'm not sure if this is considered a good job or something I should be concerned about based on the results after it set. I have contacted the contractor.

Quote Details

Re-caulking job on shower quartz bathroom walls. - Duration: 3 hours of work - Materials: Included - Caulk Type: DAP White ALEX (silicone, water and mildew resistant, specific to bathrooms)

Thank you for your feedback!

You say...

?
How would you rate this quote?
TooCheap
GoodDeal
FairPrice
BitPricey
Ripoff

Vote Distribution

Too Cheap0 votes
Good Deal0 votes
Fair Price0 votes
Bit Pricey0 votes
Ripoff1 votes

These ratings are not endorsed by Quote Critic. They are submitted by other Quote Critic users like you.

More Details

Category

Bathroom Remodeling

Price

$275

Quote Date

May 16, 2025

Comments

No comments yet

Sign in to share your thoughts and ask questions.

Similar Quotes

remove and re-grout a shower floor
Bathroom Remodeling
$2,500
Aug 20, 2025

Remove and re-grout a shower floor

The scope of work included: - Remove existing grout from shower floor - Re-grout shower floor - Seal grout

1 rating
replace shower valve and repair wall
Plumbing
$300
May 16, 2025

Replace shower valve and repair wall

Quote includes replacing a shower valve and repairing the resulting hole in the wall. The contractor also changed the pipes behind the wall to copper. The work was approved by a city inspector. - Replace shower valve - Change pipes behind wall to copper - Repair hole in wall (filled with silicone)

1 rating
Bathroom Remodeling
$6,100
Jun 11, 2025

Remodel a bathroom due to water damage

This quote is for a complete bathroom remodel due to significant water damage. The water from showering is penetrating the tiles, affecting the drywall, and leaking into the garage. The contractor stated that all existing components would need to be ripped out, and new everything would be installed. No itemized breakdown of the work or materials was provided.

1 rating