Is $20,000 to build a trex deck around a pool a fair price?

Project Details

Hired a local deck guy to build a Trex deck around our pool. The project was estimated for four weeks but is approaching its 10th week. I have already paid $15,000 of the total price.

Quote Details

Construction of a composite deck using Trex materials surrounding an existing pool. - Installation of Trex decking boards - Framing and structural support for pool surround - Labor and materials for complete deck build

Thank you for your feedback!

You say...

?
How would you rate this quote?
TooCheap
GoodDeal
FairPrice
BitPricey
Ripoff

Vote Distribution

Too Cheap0 votes
Good Deal0 votes
Fair Price0 votes
Bit Pricey0 votes
Ripoff1 votes

These ratings are not endorsed by Quote Critic. They are submitted by other Quote Critic users like you.

More Details

Category

Decking

Price

$20,000

Quote Date

June 7, 2026

Material

Composite

Comments

No comments yet

Sign in to share your thoughts and ask questions.

Similar Quotes

build a trex deck with fence relocation and overhang
Decking
$17,000
Apr 8, 2026

Build a trex deck with fence relocation and overhang

Installation of a Trex deck including structural modifications to the yard layout. - Install Trex composite decking - Relocate fence to expand the deck area - Construct a sloped overhang structure

1 rating
build a Trex deck with picture framing
Decking
$30,000
Oct 14, 2025

Build a Trex deck with picture framing

Construction of a Trex deck in the backyard, featuring a picture-frame design. The project includes the following specifications: - Deck Material: Trex composite - Design Feature: Picture-frame - Board Type (Frame & Steps): Bullnose boards

1 rating
Decking
$35,000
Jun 14, 2025

Build a 14x16 Trex deck

This quote is for the construction of a new Trex deck. The project includes: - Deck Dimensions: 14x16 feet - Decking Material: Trex (comes with a 35-year warranty) - Railing: One side will have a rail - Stairs: Two sides will feature a wrap-around stair design, two stairs high - Permitting: Handling of all HOA paperwork and permits - Demolition: Removal of an existing short 2-stair case from the back door to where pavers were located

2 ratings