chippyo

Is $7,000 to remove a kitchen wall a fair price?

Project Details

I am looking to hire a contractor to remove a kitchen wall to open up the space. I'm wondering if $7000 is too much for this work.

Quote Details

- Remove kitchen wall to open up space- Address existing gas line on the same side of the kitchen wall- Install a new ceiling range hood

Thank you for your feedback!

You say...

?
How would you rate this quote?
TooCheap
GoodDeal
FairPrice
BitPricey
Ripoff

Vote Distribution

Too Cheap0 votes
Good Deal1 votes
Fair Price0 votes
Bit Pricey0 votes
Ripoff0 votes

These ratings are not endorsed by Quote Critic. They are submitted by other Quote Critic users like you.

More Details

Category

Kitchen Remodeling

Price

$7,000

Quote Date

October 14, 2025

Comments

No comments yet

Sign in to share your thoughts and ask questions.

Similar Quotes

Kitchen Remodeling
$50,000
Jun 1, 2025

Fully gut and remodel a kitchen

This quote is for a full kitchen gut down to the studs, while keeping 80% of the same footprint. The project includes: - Move fridge from current location to outer wall - Shift doorway between kitchen and den by 12” to allow walkway clearance for fridge doors - Custom bench and floor to ceiling shelves on outer wall framing windows - Cabinets over the new fridge placement - Move dishwasher to right side of sink - Remove window over sink, close up, and add floating shelves - Seal off and move attic access from pantry - New shelving in pantry - All new plumbing (replacing original galvanized pipes) - All new cabinets (slim shaker; Waypoint preferred) - Quartz countertops - New backsplash - New recessed lighting - New stand alone range and hood - New sink - Optional: Widen the doorway between the kitchen and dining room

1 rating
do kitchen cabinet work including demo
Kitchen Remodeling
$10,000
Feb 1, 2026

Do kitchen cabinet work including demo

This quote covers specific kitchen cabinet modifications and demolition, excluding full kitchen refacing or countertop replacement. The work includes: - Refinishing all existing cabinet doors. - Replacing hood cabinets with a stainless steel hood. - Replacing kitchen trim. - Modifying the bar area to accommodate a beverage fridge, which involves: - Switching out existing combo drawers/cabinets to just cabinet doors. - Fabricating a new cabinet box and doors for the area currently occupied by the beverage fridge. - Building a 48" built-in enclosure for the refrigerator. - Demolition of existing structures and cabinets.

1 rating
complete kitchen remodel including load bearing wall removal
Pennsylvania
Kitchen Remodeling
$118,000
May 16, 2025

Complete kitchen remodel including load bearing wall removal

Estimate for a kitchen remodel project. - Removal of a load bearing wall and installation of a new engineered steel beam - Refinishing of existing hardwood in two large rooms - Replacement of tile in foyer and laundry room - Installation of new hardwood in a portion of the kitchen to match existing hardwood - Installation of all new custom cabinets - Rerouting of HVAC lines for the second story - Electrical work - Plumbing work - Installation of new Quartz Countertop and Backsplash - Demolition: $5,000.00 - Electrical: $6,000.00 - HVAC: $8,000.00 - Flooring/Backsplash: $15,270.00 - Cabinetry & Countertops: $38,211.41 - Permits: $2,000.00 - Framing Work & LB wall removal: ? - Overhead: ? - Dumpster: ? - Porta-Potty: ? - Trim & Paint: ? - Insulation/Drywall: ? - Plumbing: ?

1 rating