




Is $12,000 to remove and replace gutters, attach PVC fascia, and add reverse flashing a fair price?
Project Details
I have some rotting of the shadow board and am working on removing and replacing it. The fascia board seems okay, but has streaking and peeling paint. I'm debating if gutters are necessary, as the current ones seem to be rotting out the roof due to a crappy install and overflowing. Most neighbors in my MA community, which has all slab houses, do not have gutters. The roof's ridge line is about 24 inches from the siding, and there are ground channels that I believe are from water falling when the house had no gutters. Some areas are in mulch beds, which may cause mud to splash back. I'm not sure if I want to proceed with the quoted work because I may only want to stay here for another couple of years.
Quote Details
This quote is for the removal and replacement of existing gutters, along with the installation of new PVC fascia and reverse flashing. - Remove existing gutters - Replace with new gutters - Attach PVC fascia all around on top of the current fascia - Install reverse flashing
You say...
These ratings are not endorsed by Quote Critic. They are submitted by other Quote Critic users like you.
More Details
Category
Roofing
Price
$12,000
Quote Date
May 29, 2025
Location
Massachusetts
Tearoff included?
No
Comments
No comments yet
Sign in to share your thoughts and ask questions.
Similar Quotes
Home Addition and Remodel (Office & Patio)
This quote covers a comprehensive home addition and remodeling project, including an office and patio addition, along with various interior and exterior renovations. The project includes: **General & Planning:** - Engineered Plans: Provided by Top Homes Construction for exterior addition. - Architectural Drawings: In-house architect to draw 2D elevations and drawings (free of charge). - HOA Approval: Client to provide written approval if applicable. - Soil Compaction Test: Provided by Top Homes Construction if required. - Framing: All framing requirements put in place by architectural and engineered plans, completed by experienced framers. - Survey/Plot Plan: Client to provide for county submission. - Existing Home Builder Info: Client to provide for siding and roofing matching. - Site Cleanup: Daily cleanup included. - Costs Included: Material cost, labor, and permit. **Demolition:** - Front Steps & Pad: Removal of current front steps and pad. - Screen Room: Removal of front screen room. - Door Removal: Door leading to dining room removed for French door installation. - Window Removal: 2 windows from front of home, 1 window from laundry room. - Water Heater Removal. - Roof Removal: Small pad on front porch roof. **Foundation:** - New Block Foundation: 8x30 foundation built. - Slab: Compact filled and poured 4" slab for new front porch. - Roof Slope: Low slope roof from home corner to new addition for office room. - Office Space Extension: 10x10 extended office space (flush with new front patio). - Office Slab Addition: 100 sqft. - Front Patio Addition: 240 sqft. **Framing:** - Addition Framing: Follows architectural and engineering plans. - New Office Framing: 10x20 office (200 sqft), including all stud walls and baseplates. - Window Openings: Framing for 2 window openings (1 double window single hung front, 1 single-single hung window side). - Gable Roof: Framing to attach to existing roof. - French Door Entrance: Framing leading to dining area. - Ceiling Height: Estimated 8-10 feet. - Laundry Window: Removal and framing for siding replacement. - Porch Posts & Roof Structure: Framing for front porch and roof structure attaching to home. - Total Added Built Space: 440 sqft (200 heated living space, 240 patio space). **Windows:** - Stationary Fixed Window: Removed and new installed at front of house. - Double Vinyl Single Hung Window: Installed after removal of old single windows. - New Double Single Hung Window: Installed at front of office space. - New Single Single Hung Window: Installed on left side of office. - Window Rating: Vinyl DP-50 rated windows. **Exterior Finishes:** - Patio Posts: Hardie wrapped and painted posts. - Roof Shingles: To match existing home. - Soffit Ceiling: Vinyl soffit ceiling with vented soffit on overhangs. - Office Siding: Vinyl siding on exterior of addition. **French Doors:** - Client will provide door of choice. **Electrical & Split System:** - Electrical: Up to code for office space. - Split System: 1 installed to cool and heat office space separately from main home. - Office Lighting: 1 light with fan (client provides fan of choice). - Porch Lighting: 4 can lights. - Tankless Water Heater: Electrical up to code. **Flooring:** - LVP Allowance: Up to $2 per square foot for office space and laundry room. **Insulation:** - Installed where needed in laundry and office space. **Drywall & Paint:** - Drywall & Paint: Office space drywalled and painted. - Vinyl Removal: Vinyl removed in office space, new space drywalled, mudded, and painted. - Paint Color: Flat white paint included. - Hardie Posts: Painted white for patio. **Driveway:** - Area: Approx. 900 sqft, from street to addition and pathway to new front patio. - Material: 3000 PSI 4" concrete slab. - Inclusions: All prep, labor, and material. **Warranties:** - Split System: 10-year warranty for cooling and heating. - Workmanship: 1-year warranty. - Manufacturer Warranty: On windows, siding, and shingles (range from 15-year to lifetime).
Remove and replace gutters, attach PVC fascia, and install reverse flashing
The quote includes: - Remove existing gutters - Replace gutters - Attach PVC fascia all around on top of the current fascia - Install reverse flashing
Replace gutters and rotten fascia
Quote for replacing existing gutters and downspouts and replacing rotten fascia. - Removal of existing gutters and downspouts - Replace 80ft of 1x8 rotten fascia using 1x8 primed wood boards - Secure wood boards using exterior 2 ½ inch screws securing to beams - Additional fascia replacement available at $14 per foot - Supply and install new seamless 6 inch K Style gutters in white - Secure gutters to fascia using hidden heavy duty gutter hangers every 18-20 inches - Gutters made seamlessly on site using .032 gauge aluminum - Supply and install new 3x4 downspouts and elbows in white - Secure downspouts to siding of home - Supply and install new miters, outlets, and end caps - Seal all miters, end caps and outlets with commercial grade gutter sealant - Clean work area of debris