Is $23,000 to install a Franklin aPower 2 battery system a fair price?
Project Details
I live in Southern California in a windy area where we experienced about 5 blackouts in the last 12 months. I would like to have this system but I don’t want to overpay. I have a 3.1 KW solar system and I'm with SDGE. I just signed the agreement today.
Quote Details
Quote for installing a Franklin aPower 2 battery system as a standalone project (without solar). - One Franklin aPower 2 battery - aGate - Smart Circuits Module - Installation Note: $500 permitting cost is not included. There is also a $2500 charge for the standalone battery project.
You say...
Vote Distribution
These ratings are not endorsed by Quote Critic. They are submitted by other Quote Critic users like you.
More Details
Category
Solar
Price
$23,000
Quote Date
May 16, 2025
Location
California
Battery Storage?
No
System Size (kW)
0
Comments
No comments yet
Sign in to share your thoughts and ask questions.
Similar Quotes
Install a FranklinWH aGate and two aPower 2 batteries for solar backup
This quote is for a battery backup system designed to allow the solar array to be used when the grid is down. The system includes: - FranklinWH aGate - Two FranklinWH aPower 2 batteries - Labor, parts, and installation Note: The aGate can only handle 75% of the existing 16.8 kW solar array. The remaining panels will continue to be grid-tied, producing for the building/grid, but will not be accessible during a grid outage.
Install a FranklinWH aPower 2 battery as a retrofit backup
This quote is for the installation of a FranklinWH aPower 2 battery system as a retrofit backup to an existing SolarEdge system. - Battery System: FranklinWH aPower 2 - Purpose: Retrofit backup power - Integration: With existing SolarEdge solar system
Install a Franklin apower2 battery
Installation of one Franklin apower2 battery. The quote includes the gross cost before any rebates. - Battery Model: Franklin apower2 - Gross Cost: $23,500 - SGIP Rebate: $15,000 (This rebate is applied after the gross cost)