Is $12,500 to build a deck a fair price?
Project Details
My dad just had this deck built. I noticed there are no post-to-beam connections. The hinges used on the stairs seemed strange to me, possibly for frost heave. The pylons are about 6 feet below ground.
Quote Details
A deck was built, with the railing still pending installation. Key construction details include: - Railing: To be installed - Post-to-beam connections: Not present - Stair hinges: Used in a way that seemed unusual, possibly for frost heave - Foundation: Pylons extending approximately 6 feet below ground
You say...
Vote Distribution
These ratings are not endorsed by Quote Critic. They are submitted by other Quote Critic users like you.
More Details
Category
Decking
Price
$12,500
Quote Date
May 23, 2025
Railing included?
No
Comments
No comments yet
Sign in to share your thoughts and ask questions.
Similar Quotes

Build a deck and staircase
This quote covers the construction of a new deck and an accompanying staircase. The homeowner noted that the stairs ended up being more than the originally discussed 1-2 steps. The footings for the structure were made using concrete with "cookies" and quick cement. - Scope: Deck and staircase construction - Footings: Concrete with "cookies" using quick cement - Noted issue: Slight bend in the deck floor

Complete deck rebuild with cable railing and picture frame
Complete deck rebuild with cable railing and picture frame. - Complete rebuild of deck structure (except for 2 existing 6x6 posts) - Squaring off one side of the deck - Adding a list in concrete - Deck size: Approximately 350 sq ft plus stairs - Railing Type: Cable rail system - Decking Finish: Picture frame border

Reface existing deck, build new stairs, and new railing
- Refacing of the existing deck. - Construction of new stairs, including changes to width and relocation to the side instead of a wrap-around design. - Installation of new railing. - Contractors noted the deck structure appears acceptable, but additional support like sistering joists may be added if problems are discovered during floor replacement.