Is $2,400 to build a deck a fair price?

Project Details

I'm asking if $2,400 seems like a good price for this deck. It doesn't quite line up with the right side patio, and the flashing isn't finished, nor is the caulking.

Quote Details

This quote is for building a deck, which involved 30 hours of labor at $60 per hour. The work included demolition and leveling, and the deck was primed for paint. However, the flashing is not yet finished, and caulking has not been applied. - Labor: 30 hours at $60/hour - Included services: Demolition and leveling - Finish: Primed for paint - Outstanding items: Flashing not finished, no caulking

Thank you for your feedback!

You say...

?
How would you rate this quote?
TooCheap
GoodDeal
FairPrice
BitPricey
Ripoff

Vote Distribution

Too Cheap0 votes
Good Deal0 votes
Fair Price0 votes
Bit Pricey0 votes
Ripoff1 votes

These ratings are not endorsed by Quote Critic. They are submitted by other Quote Critic users like you.

More Details

Category

Decking

Price

$2,400

Quote Date

July 7, 2025

Comments

No comments yet

Sign in to share your thoughts and ask questions.

Similar Quotes

build a deck
Decking
$1,900
Jun 28, 2025

Build a deck

This quote is for building a deck, which the contractor states can be completed in one day using helical piles. The total cost includes: - Show-up fee: $200 (covers car and liability insurance, equipment storage, van loading, and travel to site)- Material list preparation: $200- Day rate for labor: $1500 (includes contractor's time, equipment, van, tools, planning, design, warranty, and communication)- Customer is responsible for purchasing all materials.The contractor has 10 years of finish carpentry experience. The design ensures a 3-foot clearing in front of the meter.

1 rating
build a free-standing composite deck
Decking
$17,787
Jun 4, 2025

Build a free-standing composite deck

This quote is for the construction of a new free-standing deck, including demolition of existing structures and all materials and labor. - Demolition: Remove existing wood landing and stairs located in the new deck construction area. - Foundation: Free-standing deck, not attached to the existing house. - Foundation: 13 - 20" x 20" concrete footers to support deck perimeter and central support beam. - Framing: All pressure treated construction. - Framing: 6x6 posts set on galvanized post bases. - Framing: All 6x6 support posts notched to support deck structure. - Framing: One central double 2x6 beam on max post spacing 48" OC. - Framing: Double 2x10 perimeter framing. - Framing: 2x8 joists set 16" OC attached with joist hangers on ends and spanning central beam for direct load bearing. - Framing: 4x4 ledger extensions attached to perimeter framing to support one wrap-around step. - Decking: 5/4 x 6 composite decking. - Decking: Attached with hidden deck fasteners on main deck / surface screws on perimeter and stair treads. - Decking: Layout as per plan with additional deck trim to cover exposed ends at step area and to provide toe space at top step. - Other: Extend downspout to run through deck into under deck drain line. - Allowance: Decking @ $5.50 /LF ($3,432). - Includes: Materials & Labor.

1 rating
Decking
$69,763
Jul 11, 2025

Build a new deck (Good option)

- 2nd consultation for design and materials overview- 3D rendered imagery for detailed planning- site prep- build new substructure using premium select #1 treated lumber- helical pier footings- landscape fabric and crushed 3/4 clean stone under deck to help with water management- proper flashing at house to prevent future rot per IRB Code and add any additional flashing under door- deck ledger to be installed with Composite framing lumber to eliminate future rot- joist coating on top of every joist to preserve life of treated lumber- double 2x12 main beams- 6x6 support columns- blocking for picture frame boarder at deck perimeter- Composite decking ( Color TBD )- all hidden fasteners and screws- Black aluminum railing with black balusters- Color matched fascia- stairs to lower yard- zmaxx corrosion resistance hardware- blue prints, permits and inspections- proper site cleanup

1 rating