Is $1,900 to build a deck a fair price?
Project Details
I thought the $1900 quote was "robbery" and ended up hiring someone else who had no idea what they were doing. I'm sure they only spent around $300 in total.
Quote Details
This quote is for building a deck, which the contractor states can be completed in one day using helical piles. The total cost includes: - Show-up fee: $200 (covers car and liability insurance, equipment storage, van loading, and travel to site)- Material list preparation: $200- Day rate for labor: $1500 (includes contractor's time, equipment, van, tools, planning, design, warranty, and communication)- Customer is responsible for purchasing all materials.The contractor has 10 years of finish carpentry experience. The design ensures a 3-foot clearing in front of the meter.
You say...
Vote Distribution
These ratings are not endorsed by Quote Critic. They are submitted by other Quote Critic users like you.
Comments
No comments yet
Sign in to share your thoughts and ask questions.
Similar Quotes

Build a deck
This quote is for building a deck, which involved 30 hours of labor at $60 per hour. The work included demolition and leveling, and the deck was primed for paint. However, the flashing is not yet finished, and caulking has not been applied. - Labor: 30 hours at $60/hour - Included services: Demolition and leveling - Finish: Primed for paint - Outstanding items: Flashing not finished, no caulking
Build a deck
This quote is for building a new deck. - Deck Design: Same as discussed with both contractors - Materials: Same materials as discussed with both contractors - Permitting: Contract will stipulate payment is contingent on a successful permit and inspection from the town

Build a free-standing composite deck
This quote is for the construction of a new free-standing deck, including demolition of existing structures and all materials and labor. - Demolition: Remove existing wood landing and stairs located in the new deck construction area. - Foundation: Free-standing deck, not attached to the existing house. - Foundation: 13 - 20" x 20" concrete footers to support deck perimeter and central support beam. - Framing: All pressure treated construction. - Framing: 6x6 posts set on galvanized post bases. - Framing: All 6x6 support posts notched to support deck structure. - Framing: One central double 2x6 beam on max post spacing 48" OC. - Framing: Double 2x10 perimeter framing. - Framing: 2x8 joists set 16" OC attached with joist hangers on ends and spanning central beam for direct load bearing. - Framing: 4x4 ledger extensions attached to perimeter framing to support one wrap-around step. - Decking: 5/4 x 6 composite decking. - Decking: Attached with hidden deck fasteners on main deck / surface screws on perimeter and stair treads. - Decking: Layout as per plan with additional deck trim to cover exposed ends at step area and to provide toe space at top step. - Other: Extend downspout to run through deck into under deck drain line. - Allowance: Decking @ $5.50 /LF ($3,432). - Includes: Materials & Labor.