Is $9,000 to install engineered hardwood flooring and baseboards (labor only) a fair price?
Project Details
I want to get engineered hardwood flooring glued down installed in 4 rooms and 2 living rooms, and also get 16 stairs done. The total area is around 1340 sq ft. The floor has been demoed and cleaned, ready for installation. I also need baseboard installed all around the house, which is about 25 16ft strips. I received three estimates: $9,000, $11,000, and $12,300. These prices do not include any material. I am asking if these prices are about right and which option would be best.
Quote Details
Installation of engineered hardwood flooring (glued down) and baseboards. This quote does not include any material costs. - Flooring Installation: Engineered hardwood, glued down - Areas: 4 rooms, 2 living rooms - Stairs: 16 steps - Baseboard Installation: Approximately 25 16ft strips around the house - Preparation: Floor has been demoed and cleaned, ready for installation - Materials: Not included
You say...
Vote Distribution
These ratings are not endorsed by Quote Critic. They are submitted by other Quote Critic users like you.
More Details
Category
Flooring
Price
$9,000
Quote Date
June 25, 2025
Home Size
1,340 sq ft
Flooring material
Hardwood
Removal included
No
Subfloor work?
No
Comments
No comments yet
Sign in to share your thoughts and ask questions.
Similar Quotes

Install flooring, shoemoulding, and stairs
Quote for flooring installation on the third floor, including: - Install 770 sqft of floor - Install 300 ft of white shoemoulding - Install 34 steps and 3 landing - Remove and disposal carpet - Supplies: 300 ft of white shoemoulding - Supplies: 34 white risers
Install glue down vinyl plank flooring and stairs
This quote covers the installation of glue-down vinyl plank flooring and stairs, including all necessary prep work and removal of existing materials. The company stated they only do glue-down installations due to past warranty issues with click & lock floors. - Remove & dispose existing carpeting (~1,000 square feet) - Remove & dispose existing sheet vinyl (~400 square feet) - Remove & dispose existing baseboard - Prep subfloor - Furnish & install 1/4” plywood - Furnish & install glue down vinyl plank - Furnish & install 13 vinyl stair treads & risers - Install customer supplied baseboard - Plumber to remove & reset 3 water closets - Moving customer’s furniture/appliances (customer responsible for disconnecting & re-connecting all electronics) - Manufacturer Warranty: 15 years - Labor Warranty: 5 years
Replace carpet with engineered hardwood
This quote is for replacing carpet on the second floor with engineered hardwood, covering approximately 730 square feet. The quote includes: - Hardwood Material: 730 sqft at $6.49/sqft - Door Reducers - Wood Installation: Nail and glue method - Carpet Removal and Disposal - Trim