Is $5,800 to reroute ductwork for wall removal a fair price?
Project Details
I own a 2 story home (3 with basement) and am having a wall removed that has 3 supply vents and 2 returns going up to the 2nd level. I am doing all of the drywall demo and refinishing myself.
Quote Details
Reroute ductwork to accommodate the removal of a wall containing 3 supply vents and 2 returns going to the second level. - Install approximately 65 feet of 8"x8" ductwork plus connections - Convert three 6" round supply lines into one 8"x8" duct for 30 feet - Add one additional 90-degree turn - Route ductwork along floor joists and a load-bearing beam
You say...
Vote Distribution
These ratings are not endorsed by Quote Critic. They are submitted by other Quote Critic users like you.
Comments
No comments yet
Sign in to share your thoughts and ask questions.
Similar Quotes
Replace R8 supply ducts
This quote is for the labor and materials to replace five R8 supply ducts. The work involves: - Running new R-8 supply ducts - Suspending ducts from rafters, strapped with duct straps - Installing volume control dampers - Sealing all duct connections for air leaks - Duct Sizes: Three 8-inch, one 9-inch, and one 6-inch ducts - Drywall removal is required for installation, with 50% of the work in a drop ceiling and 50% above drywall.
Re-install duct work on 1st and 2nd floors
This quote is for the re-installation of duct work on the first and second floors of the house, following the removal of existing duct work due to asbestos mitigation. The scope of work includes: - 7 Supplies Main Floor - 5 Returns Main Floor - 5 Supplies 2nd Floor - 4 Returns 2nd Floor - Run Supplies and Returns to 2nd Floor in Wall - Vent Range Hood Outside of House - 2 Fans: 1 on 1st Floor and 1 on 2nd Floor Notes: - All electrical work is to be completed by a licensed electrician. - Half down payment is required to start, with the remaining balance due upon completion.
Move HVAC ducting and add new vent opening
This option involves moving HVAC ducting and adding a new vent opening. It includes: - Ducting: 4" flexible ducting - Installation: Through the stud to the left, connected to a transition for a new opening - Additional work: Terminate the existing duct in the floor and open it in the room below