chippyo
redo all the piping for a Navien combi-boiler
New York
Photo 1
Photo 2

Is $6,000 to redo all the piping for a Navien combi-boiler a fair price?

Project Details

I hired a new HVAC guy for a different issue. He saw the setup of my Navien combi-boiler and said it was done terribly and would not last another 6 months. The system was originally installed by someone hired by my house’s previous owner. I am looking for opinions on whether the quote is reasonable.

Quote Details

This quote is to redo all the piping for the existing Navien combi-boiler setup. It includes: - New piping - Labor for installation The quote does not include a new Navien unit.

Thank you for your feedback!

You say...

?
How would you rate this quote?
TooCheap
GoodDeal
FairPrice
BitPricey
Ripoff

Vote Distribution

Too Cheap0 votes
Good Deal0 votes
Fair Price0 votes
Bit Pricey0 votes
Ripoff1 votes

These ratings are not endorsed by Quote Critic. They are submitted by other Quote Critic users like you.

More Details

Category

HVAC

Price

$6,000

Quote Date

February 22, 2026

Location

New York

Brand/model

Navien combi-boiler

System type

Boiler

Comments

No comments yet

Sign in to share your thoughts and ask questions.

Similar Quotes

replace a 75 gallon natural gas power vented water heater
Pennsylvania
Plumbing
$4,600
Jun 3, 2025

Replace a 75 gallon natural gas power vented water heater

This quote includes the supply and installation of a new 75-gallon natural gas power vented water heater, along with all necessary piping and fittings. - Water Heater Type: 75 gallon natural gas power vented - Included Components: Mixing valve, Expansion tank - Piping Material: 3/4 copper - Fittings: All 3/4 fittings needed to assemble the water heater correctly

Awaiting feedback
Map of 85044
Arizona
HVAC
$7,409
Jun 4, 2025

Perform comprehensive HVAC system repair and maintenance

This quote covers a comprehensive set of HVAC services, including: - Uninstallation and disposal of the old damaged coil. - Leak free installation of the new coil. - Full system testing and calibration for peak performance. - Uninstallation and disposal of the old damaged filter drier. - Leak free installation of the new filter drier. - Full system testing and calibration for peak performance. - Refrigerant leak detection. - Recover refrigerant. - Nitrogen purge. - Leak repair. - Pressure test. - All refrigerant recovery and recycling following EPA protocol. - Purging refrigerant lines with dry nitrogen. - Accurate refrigerant weigh in/out with calibrated scale. - Complete refrigerant testing for peak system operation using super heat and sub cooling diagnostics. - Adding refrigerant to EPA guidelines. - Remove schrader core with isolation tool. - Install new schrader core and new cap. - Leak test service valve.

2 ratings3 comments
HVAC
$14,886
Feb 22, 2026

Install a Navien 95% AFUE modulating boiler and new baseboard heating system

This quote includes the installation of a new high-efficiency Navien boiler and a comprehensive baseboard heating distribution system, along with all necessary components and labor. - Boiler: Navien, NHB-80H, 95% AFUE Modulating Boiler, 80,000 BTU Heating - Controls: Navien outdoor reset control, Navien easy up manifold - Heating Zones: Three (3) zones heating with new ECM pumps - Thermostats: Three (3) Honeywell P200 thermostats - System Components: Auto fill valve, Expansion tank, Backflow preventor, Air scoops and vents, Stainless steel ball valves and bleeders, Condensate pump and drain lines - Boiler Installation: All necessary copper to complete installation, PVC direct venting to outside - Cleanup: Removal of all job site debris and old equipment - First Floor Zoning: Separate baseboard into one zone for kitchen, living room, dining room - Second Floor Zoning: Separate baseboard into one zone for 2 bedrooms and bathroom - New Baseboard Installation: All new Slantfin 30 in living room, dining room, and kitchen (16', 10', and 8' sections) - Baseboard Relocation: Proposed 10' section relocated from stairwell to outer back wall below picture windows - Baseboard Reuse: Existing baseboard reused in bedrooms and bathroom - Distribution Installation: All necessary copper to complete installation - Heat Exchanger Warranty: 15 Years - Parts Warranty: 5 Years - Labor Warranty: 5 Years

1 rating