Is $120,000 to extensive kitchen remodel and first floor renovation (GC labor) a fair price?

Project Details

We're doing an extensive kitchen remodel and removing walls, at least one is structural so engineering, beams, and possibly a pillar are needed. Likely another 80k total for all materials such as cabinets, counters, appliances, lighting, etc. This is the first of several GC estimates. I assume the microwave venting can be swapped for a vented cooktop hood. Our built in microwave won't be vented. What other information do you need? Happy to supply it if I can.

Quote Details

Estimate for general contractor labor for an extensive kitchen remodel and first floor renovation. Includes: - Permitting: Obtain building, plumbing, and electrical permits; supply structural engineering for steel beams. - Dust protection / Demolition: Supply and install floor and dust protection; remove existing kitchen to framing, specified walls (including structural), and closet; remove/relocate pumping and heating to second floor; temporarily support second floor and remove walls between kitchen, living, and dining room. - Framing: Supply and install 8" flush steel beams, 4" x 6" PSL post, and 4" steel lolly columns in basement (with concrete footings); frame for new window; supply and install new walls. - Window: Supply and install Harvey Classic awning window at kitchen sink; supply and install exterior trim and siding. - Rough Plumbing: Remove/relocate existing plumbing; supply and install new plumbing; supply and install Oatey ice maker box connection, gas piping for range, and plumbing venting through roof. - Rough Electrical: Remove/relocate wiring; supply and install dedicated circuits (refrigerator, microwave, range, dishwasher, counter outlets); supply and install 10-5" LED recessed lights and under cabinet lighting; supply and install plugs and switches to satisfy code. - HVAC: Supply and install microwave venting to exterior. - Heating: Supply and install baseboard and toekick heater. - Insulation: Supply and install R-15 Roxul in exterior walls (with vapor barrier), R-39 fiberglass in ceiling (with vapor barrier), Roxul fires/draft stopping, and firecaulking. - Wall/Ceiling: Supply and install 1/2" gypsum blueboard and 1/8" plaster skim coat. - Finish: Install owner supplied cabinets, countertops, knobs/pulls, baseboard trim, window and door trim, and tile backsplash. - Appliance Installation: Install owner supplied sink faucet, dishwasher, gas range, refrigerator, and microwave. - Finish Electrical: Supply and install LED under cabinet lighting, standard white toggle switches/wall plates, and standard white GFCI/outlets/wall plates. - Paint (entire first floor): Sand, fill, caulk; supply and install latex primer and two top coats on walls, ceiling, and trim. - Flooring: Supply and install 2 1/4" white oak flooring patches; sand and refinish entire first floor. - Sanitation: Supply waste removal.

Thank you for your feedback!

You say...

?
How would you rate this quote?
Too Cheap
Good Deal
Fair Price
Bit Pricey
Ripoff

Vote Distribution

Too Cheap0 votes
Good Deal0 votes
Fair Price0 votes
Bit Pricey1 votes
Ripoff0 votes

These ratings are not endorsed by Quote Critic. They are submitted by other Quote Critic users like you.

More Details

Category

Kitchen Remodeling

Price

$120,000

Quote Date

May 16, 2025

Comments

No comments yet

Sign in to share your thoughts and ask questions.