



Is $2,200 to replace a warped and leaking shower door a fair price?
Project Details
I just bought a house and have two bathrooms that both need attention. In the first bathroom, the shower door is warped and leaking, and I'm hoping to replace it myself but am unsure where to find the right door or how difficult the job is. In the second bathroom, the shower floor tiles are in very bad shape, though there's no leaking. The old owner seems to have just caulked over them repeatedly. I'm hoping to just tile over the existing tiles myself since there's no leaking, and I'm wondering if this is feasible.
Quote Details
This quote is for the replacement of a warped and leaking shower door in one of the bathrooms. The existing door is causing leaks and needs to be fully replaced.
You say...
These ratings are not endorsed by Quote Critic. They are submitted by other Quote Critic users like you.
More Details
Category
Bathroom Remodeling
Price
$2,200
Quote Date
August 11, 2025
Comments
No comments yet
Sign in to share your thoughts and ask questions.
Similar Quotes
Replace a walk-in shower due to failed grout
This quote is for the replacement of a walk-in shower due to failed grout and water seepage. - Problem: Grout in the shower has failed, causing water seepage that is leaking to the unit below and into the baseboard and walls. - Scope of Work: Total demolition and reinstallation of the walk-in shower. - Exclusions: The drain pan was inspected and found to be fine.

Install a new shower door, fixed panel, and knee wall panel
Installation of a new shower door system, which includes: - A shower door - A fixed panel - A knee wall panel - The new shower setup itself is from Samuel Mueller
Remodel a bathroom due to water damage
This quote is for a complete bathroom remodel due to significant water damage. The water from showering is penetrating the tiles, affecting the drywall, and leaking into the garage. The contractor stated that all existing components would need to be ripped out, and new everything would be installed. No itemized breakdown of the work or materials was provided.