Is $20,000 to remodel a master bathroom a fair price?
Project Details
I hired a GC company for a turnkey master bath remodel for $20,000, which seemed a bit on the cheaper side. I lost trust due to numerous issues during the project. The contractor initially suggested a very cheap shower system, so I purchased a $1400 Kohler system myself. The plumbers installed the diverter valve incorrectly (cold on left, hot on right) and a leaking tub valve required multiple fixes. The tile contractors laid backerboard without thinset or tape, and waterproofing was inadequate (only some Redguard along seams). They filled the shower pan with mortar on top of the liner without a leak test, despite my request. The Schluter job on the curb was terrible, and they used floor tile of a different tint than I ordered. I am now asking them to remove everything down to the studs and plan on firing them. During my own demolition, I discovered the niche tile was directly on drywall and all tile is easily removable, suggesting improper thinset application. I am concerned about the actual labor skills, plumbing, and waterproofing, as these issues could jeopardize my house or family's health. I acknowledge my mistake in choosing the cheapest option and not getting a third quote, as another company quoted $45,000. I am currently demoing the entire bathroom myself and getting two more quotes from contractors who have worked for me before. I have a contract that listed demo, plumbing, electricity, tile and tile labor, cabinetry, and allowances for tile and some hardware, with the mirror being the only exclusion. I am looking into filing a small claim case to recover money for undone work.
Quote Details
This quote is for a turnkey master bathroom remodel. The scope of work includes: - Demolition of existing bathroom components - Plumbing work - Electrical work - Tile installation and associated labor - Cabinetry installation - Allowances for tile and some hardware - Excludes: Mirror
You say...
Vote Distribution
These ratings are not endorsed by Quote Critic. They are submitted by other Quote Critic users like you.
More Details
Category
Bathroom Remodeling
Price
$20,000
Quote Date
February 1, 2026
Location
Texas
Comments
No comments yet
Sign in to share your thoughts and ask questions.
Similar Quotes
Replace 30 can lights, 11 dimmers, 3 bathroom lights, change/move kitchen light, replace under cabinet light
This estimate covers labor and materials for various electrical and lighting upgrades. Please note that patching and painting are not included in this estimate, but referrals can be provided. Any additional required alterations by the city or client not explicitly listed will be billed on a time and materials basis. - Labor: Bypass transformer and install LED trim on 4" LV cans (30 units) - Materials: Elco 4" Warm Dim Trim line voltage (30 units) - Labor: Installation, syncing, and programming (billed time and materials) - Reused Components: Existing three-way switches (on/off functionality) - Included Components: Dimmers in bathrooms, screwless cover plates throughout - Lighting Control: Lutron Caseta Diva Style (11 units) - Lighting Control: Lutron Bridge (1 unit) - Lighting Control: 4-button Pico remote (2 units) - Lighting Control: Standard Pico with stand (2 units - one for living room, one for master bedroom) - Lighting Control: Pico Holder (1 unit) - Cover Plate: White screwless 1-gang cover plate (15 units) - Cover Plate: 2-gang screwless cover plate (5 units) - Cover Plate: Lutron Screwless 3-gang cover plate (2 units) - Outlet/Cover Plate: Brown outlet and screwless cover plate for peninsula (1 unit) - Dimmer: DVCL153 (3 units) - Dimmer: Lutron CL Diva Dimmer (for bathrooms) (1 unit) - Labor: Relocate countertop light (includes covering old location with blank out) - Materials: Fan box, wire, protective materials - Labor: Replace under cabinet lights (2 units - 29" and 18") - Under Cabinet Lights: Elco 18" & 29" (1 unit)

Renovate a master bathroom
This project involved a complete master bathroom renovation. The homeowner performed the initial demolition. - Demolition: Performed by homeowner with a friend over two 8-hour days. - Contractor Work: - Framing - Waterproofing - Sheetrock installation - Concrete board installation - Tiling - Pocket door installation - Electrical Work (by electrician friend): - Added an outlet by the toilet - Moved two existing outlets - Ran 2 homeruns (1 for bidet, 1 for heated floor) - Moved and installed new exhaust fan - Installed two new lights above the shower - Changed out original lights - Plumbing Work (by recommended plumber): - Moved three fixtures and a drain - Installed sink, sink fixtures, and shower fixtures - Includes all materials
Remodel a bathroom
This quote is for a full bathroom remodel. The work included tile installation and grouting. However, issues have been identified with the grout, which is running out and has cavities. Additionally, the tile work exhibits inconsistent grout lines (some over, some under 1/8 inch). There was also a delay of over a week between grout completion and the installation of the shower head and knob.