


Is $10,000 to resurface a deck with Elite Crete epoxy flake a fair price?
Project Details
I moved in a year ago and focused on the inside of the house first. When it rains, water stays put on the deck and doesn’t go to the drain, causing buildup. I was originally going to do a cooling deck, but the contractor said this epoxy system lasts much longer and is great quality. I'm going to get another estimate for sure.
Quote Details
The project involves resurfacing the deck to address existing water drainage issues. The scope of work includes: - Grinding the entire deck surface down - Pressure washing the deck - Applying an "Elite Crete epoxy flake deck" system - Grinding specific areas to create a slight slope, ensuring water drains properly The contractor stated that this epoxy system lasts much longer and is of great quality compared to a cooling deck.
You say...
Vote Distribution
These ratings are not endorsed by Quote Critic. They are submitted by other Quote Critic users like you.
Comments
No comments yet
Sign in to share your thoughts and ask questions.
Similar Quotes
Refinish 900 sq ft of pool deck
This quote is for refinishing approximately 900 sq. ft. of pool deck. - Grind/scarify entire pool deck - Saw cut, steel stitch, and epoxy fill cracks in pool deck (note: cracks may reappear with ground movement/heaving/settling of sub-base) - Delete fence holes - TSP scrub, wash, and pressure wash entire pool deck and cantilever edge - Apply Xcel Acrylic Scratch Coat over entire pool deck and cantilever edge - Apply Xcel Acrylic “Lace” texture over entire pool deck and cantilever edge - Apply (2) coats of Xcel Topcoat Color Seal over entire pool textured deck and cantilever edge (color choice TBD) - Re-fill pool and add start-up chemicals (homeowner to supply water hose and water for pool refill) - Complete pool and yard clean-up of all pool deck renovation spoils

Resurface a wraparound wood deck
This option is for resurfacing the remaining portion of an 800 sq ft wraparound wood deck. The deck is approximately 25-30 years old, 8 feet above ground, and located by salt water. - Includes: Resurfacing of the deck- Includes: 1 new stair- Includes: 2 gates

Reseal an upper deck
The project manager from the original company, who has since started a new company, resealed the upper deck. The work was performed using the same Westcoat waterproofing product that was originally applied. This resealing was intended to address a resurfaced leak that was allowing water to enter the house. Following the resealing, a leak check was performed, and the deck is still leaking, specifically adjacent to the drain.