




Is $3,556 to install flooring, shoemoulding, and stairs a fair price?
Project Details
I am getting the entire third floor replaced with Engineered Hardwood. I will be providing the Engineered Hardwood material myself, and the contractor will provide installation and other materials. I spoke to 4 contractors, and this local contractor's quote is the best one so far. I am confused if I should replace the carpet flooring of stairs with engineered hardwood, considering we're going to have a baby soon (cushion safety) compared to engineered hardwood, but it may not be aesthetically pleasing, and babies could potentially chew the carpet. I'm leaning towards keeping the carpet on the stairs for now and replacing it later. This is a brand new build, a Quick Move-in home, so I didn't get the opportunity to go through the design studio. The builder gave carpet on the top floor where we have bedrooms and Engineered Hardwood elsewhere. I need to double-check with the contractor on the materials I need to buy for this job, specifically glue and stair nosings. I'm trying to get a couple more estimates to see if there's a pattern, but both individual contractors came around the same price compared to big box stores. The contractor seems reputable with good reviews and is bonded and insured. The project is expected to take two days.
Quote Details
Quote for flooring installation on the third floor, including: - Install 770 sqft of floor - Install 300 ft of white shoemoulding - Install 34 steps and 3 landing - Remove and disposal carpet - Supplies: 300 ft of white shoemoulding - Supplies: 34 white risers
You say...
Vote Distribution
These ratings are not endorsed by Quote Critic. They are submitted by other Quote Critic users like you.
More Details
Category
Flooring
Price
$3,556
Quote Date
May 16, 2025
Location
New Jersey
Home Size
770 sq ft
Removal included
No
Square footage
770
Comments
No comments yet
Sign in to share your thoughts and ask questions.
Similar Quotes
Home Addition and Remodel (Office & Patio)
This quote covers a comprehensive home addition and remodeling project, including an office and patio addition, along with various interior and exterior renovations. The project includes: **General & Planning:** - Engineered Plans: Provided by Top Homes Construction for exterior addition. - Architectural Drawings: In-house architect to draw 2D elevations and drawings (free of charge). - HOA Approval: Client to provide written approval if applicable. - Soil Compaction Test: Provided by Top Homes Construction if required. - Framing: All framing requirements put in place by architectural and engineered plans, completed by experienced framers. - Survey/Plot Plan: Client to provide for county submission. - Existing Home Builder Info: Client to provide for siding and roofing matching. - Site Cleanup: Daily cleanup included. - Costs Included: Material cost, labor, and permit. **Demolition:** - Front Steps & Pad: Removal of current front steps and pad. - Screen Room: Removal of front screen room. - Door Removal: Door leading to dining room removed for French door installation. - Window Removal: 2 windows from front of home, 1 window from laundry room. - Water Heater Removal. - Roof Removal: Small pad on front porch roof. **Foundation:** - New Block Foundation: 8x30 foundation built. - Slab: Compact filled and poured 4" slab for new front porch. - Roof Slope: Low slope roof from home corner to new addition for office room. - Office Space Extension: 10x10 extended office space (flush with new front patio). - Office Slab Addition: 100 sqft. - Front Patio Addition: 240 sqft. **Framing:** - Addition Framing: Follows architectural and engineering plans. - New Office Framing: 10x20 office (200 sqft), including all stud walls and baseplates. - Window Openings: Framing for 2 window openings (1 double window single hung front, 1 single-single hung window side). - Gable Roof: Framing to attach to existing roof. - French Door Entrance: Framing leading to dining area. - Ceiling Height: Estimated 8-10 feet. - Laundry Window: Removal and framing for siding replacement. - Porch Posts & Roof Structure: Framing for front porch and roof structure attaching to home. - Total Added Built Space: 440 sqft (200 heated living space, 240 patio space). **Windows:** - Stationary Fixed Window: Removed and new installed at front of house. - Double Vinyl Single Hung Window: Installed after removal of old single windows. - New Double Single Hung Window: Installed at front of office space. - New Single Single Hung Window: Installed on left side of office. - Window Rating: Vinyl DP-50 rated windows. **Exterior Finishes:** - Patio Posts: Hardie wrapped and painted posts. - Roof Shingles: To match existing home. - Soffit Ceiling: Vinyl soffit ceiling with vented soffit on overhangs. - Office Siding: Vinyl siding on exterior of addition. **French Doors:** - Client will provide door of choice. **Electrical & Split System:** - Electrical: Up to code for office space. - Split System: 1 installed to cool and heat office space separately from main home. - Office Lighting: 1 light with fan (client provides fan of choice). - Porch Lighting: 4 can lights. - Tankless Water Heater: Electrical up to code. **Flooring:** - LVP Allowance: Up to $2 per square foot for office space and laundry room. **Insulation:** - Installed where needed in laundry and office space. **Drywall & Paint:** - Drywall & Paint: Office space drywalled and painted. - Vinyl Removal: Vinyl removed in office space, new space drywalled, mudded, and painted. - Paint Color: Flat white paint included. - Hardie Posts: Painted white for patio. **Driveway:** - Area: Approx. 900 sqft, from street to addition and pathway to new front patio. - Material: 3000 PSI 4" concrete slab. - Inclusions: All prep, labor, and material. **Warranties:** - Split System: 10-year warranty for cooling and heating. - Workmanship: 1-year warranty. - Manufacturer Warranty: On windows, siding, and shingles (range from 15-year to lifetime).
Replace carpet with engineered hardwood
This quote is for replacing carpet on the second floor with engineered hardwood, covering approximately 730 square feet. The quote includes: - Hardwood Material: 730 sqft at $6.49/sqft - Door Reducers - Wood Installation: Nail and glue method - Carpet Removal and Disposal - Trim
Install engineered hardwood flooring and baseboards (labor only)
Installation of engineered hardwood flooring (glued down) and baseboards. This quote does not include any material costs. - Flooring Installation: Engineered hardwood, glued down - Areas: 4 rooms, 2 living rooms - Stairs: 16 steps - Baseboard Installation: Approximately 25 16ft strips around the house - Preparation: Floor has been demoed and cleaned, ready for installation - Materials: Not included